[Marvel Product Case Study] Yamaiichi Industrial Hydroelectric Power Plant
We have delivered water wheels to 36 countries across 5 continents. There is also one located about 15 km from Mount Fuji.
We would like to introduce a case study of a product implementation by our partner company, Marvel. One of the small facilities they have implemented is a small hydropower plant located approximately 15 km from Mount Fuji. This is the Yamaichi Industrial Hydropower Plant, which began operations after renovations of the existing facility. The company has newly installed a horizontal "Francis turbine." As a result, the power output of this facility has doubled from the existing 70 kW to 132 kW. [Case Study] ■ Location: Yamaichi Industrial Hydropower Plant ■ Product Implemented: 1 Francis turbine, 140 kW *For more details, please refer to the PDF document or feel free to contact us.
- Company:日本小水力発電
- Price:Other